
Deck Builders Wollongong


Decks Built on Solid Ground
Hardwood, treated pine and capped composite all behave differently in coastal weather, so we walk you through the look, the upkeep and the cost of each before we price anything. Stairs, landings, balustrades and privacy screens are built by the same crew, so the details stay consistent.
Where the ground needs shaping first, our excavation and earthworks team handles it. To plan your deck with Retain by Theo, call 0417 661 224 for a free quote.
- Hardwood, pine and composite decking
- Engineered footings and sub-frames
- Stairs, landings and compliant balustrades
- Pool and elevated deck construction
- Deck repairs, restoration and refinishing
- Free on-site quotes across the Illawarra
What Our Deck Building Covers


How We Build Your Deck
Every deck we build follows the same order, because the parts nobody sees decide how the finished surface feels years later. Here is what the process looks like from first visit to final coat.
- Site visit and measure: we check levels, soil, access and the height off the ground, then talk through boards, sizes and where the stairs should land.
- Footings and piers: we dig to the depth the soil and load require and pour piers sized for the span rather than guessed at.
- Sub-frame: bearers and joists are chosen for their real span, ledgers flashed into sound structure, and every bracket and bolt rated for outdoor use.
- Decking: boards are laid to consistent gaps with concealed or top fixings, cut clean at the edges and finished with a proper fascia.
- Stairs and balustrade: treads, landings and compliant balustrades are built as part of the structure, not added on after the boards go down.
- Finishing: we oil, stain or seal the deck, clean the site down and set out a maintenance routine you can realistically keep up with.

Frequently Asked Questions
Most residential decks run one to two weeks on site once materials land. Footings and framing take the first stretch, boards and balustrade the second. Elevated decks, stairs and difficult access add a few days rather than weeks.
Low decks under a set height and area often fall under exempt development, while raised decks near boundaries usually need approval. We assess the height, setbacks and site before quoting and prepare the paperwork where it is required.
Neither is better outright. Composite holds its colour and skips the annual sand and oil, which suits pool surrounds and coastal streets. Hardwood costs less up front and has a depth of grain composite cannot quite match.
